Rawicz Gas Field:
Powering energy transition in Europe

Drilled, tested and development-ready.
A 742 km² license area sitting in Poland’s most productive gas province.

Positioned in
Poland's proven Rotliegend gas province

Rawicz sits at the heart of a producing trend. The neighboring fields, Zalecze-Wiewierz and Borzęcin, are both in active production under the license of Polish multinational gas trader Orlen. The field’s favorable location provides direct validation for reservoir quality and the availability of reliable regional infrastructure.

The Rawicz license offers the oppo to double the size of the gas reserves through 6 more low-risk ILX prospects, revealed via a 3D seismic survey in Rotliegend.

Development Plan

Two-phased Low-CAPEX With Rapid Path To Production

Phase 1: In progress

Two wells have been completed, and the drilling of a third well is scheduled for September 2026. A connection to the existing Gaz Systems’ low methane gas pipeline is underway, with first gas to be achieved by H2-2028.

Phase 2: From 2028

Eight additional wells to be constructed though 2029 to 2031, financed by internal cashflows from gas production by operational wells. Connection and offtake terms for commercial sales are secured.

Next
Next

Nowa Sol Oil Wells